After applying Damit, no leakage whatsoever.

"Six to eight weeks later we had no leakage whatsoever and we no longer have any leaks at all." - Robbie Richardson, Houghton Golf Club

After applying DamIt no leakage whatsoever.

Date 20th August 2020.

Ref: Reference letter – Aqua Plastech 

We at Houghton Golf Club noticed an increase level of water seepage in our 9th dam quite some time ago. The dam, which holds about 250,000,00 liters of water was originally built in 2006/2007 and had a bentonite base. Over time with crabs, fish & general wildlife disrupting the dam base. We found a weakened structure in the dam wall and this subsequently resulted in considerable water loss. 

Having done some investigation into the possible solutions, we decided to move forward with Andre Fourie and Aqua Plastech’s DamIt™ Dam Sealer to seal the dam. Andre arrived with his dispensing unit which was actually a large drone to ensure an even distribution of DamIt™ Dam Sealer over the entire dam area. 

After applying Damit, no leakage whatsoever.

After the first few days we did notice less seepage and over time the wet areas adjacent to the dam did lessen in size. Six to eight weeks later we had no leakage whatsoever and we no longer have any leaks at all. 

Would certainly recommend this product to anyone looking to seal their dams.

Thanks Andre, Well done!

Robby Richardson

CEO of Houghton Golf Club

Leave a Comment

Your email address will not be published. Required fields are marked *

Shopping Basket